Building One · Opening November 1, 2026
One- and two-bedroom homes on a new waterfront campus in Rumford — ten minutes from the East Side.
Two Ways to Live Here
For Rent
Seventy one- and two-bedroom homes with a courtyard, a fitness centre and parking included. Opening November 1, 2026.
See the apartmentsFor Sale
Seventeen waterfront residences on the Seekonk River, built and sold by Churchill & Banks.
Explore the condominiumsThe Place
The Seekonk River wraps East Point on three sides. Providence sits across the water; the East Side — Brown, RISD, Wayland Square — is a ten-minute drive over the bridge. For most of the last century this was working industrial land at Phillipsdale.
Churchill & Banks spent years remediating and master-planning it into something else: a 27-acre waterfront neighborhood that will hold 392 homes at full buildout — condominiums, townhomes and, now, two apartment buildings.
The Residences
Every home is new construction with a full-size washer and dryer, quartz counters and stainless appliances. No shared laundry, no compromises on the basics.
Quartz countertops
In kitchens and baths, with an island or peninsula in most layouts.
Stainless steel appliances
Full-size range, dishwasher, microwave and refrigerator.
Washer and dryer
In every apartment, without exception.
Luxury vinyl plank & tile
Wide-plank LVT through the living areas, porcelain tile in the baths.
Balconies
On select homes — look for the balcony tag on the floor plans.
Water views
Unobstructed river views from a number of apartments.
Walk-in closets
In the majority of one- and two-bedroom layouts.
Elevator access
To all four floors, from the lobby and the parking areas.
Floor Plans
From 658 to 1,113 square feet, in 5 one-bedroom and 9 two-bedroom arrangements.
One Bedroom756 sq ft · 1 bed · 1 bath
Two Bedroom991 sq ft · 2 bed · 2 bath
Two Bedroom1,113 sq ft · 2 bed · 2 bathAmenities
A courtyard built for actually spending time in — and the practical things a new building should have but often doesn’t.
What’s Next
Fifty-eight more apartments on the same campus, with a fourth-floor roof terrace. Construction begins in 2026 with delivery expected in late 2027.
When both buildings are complete, East Point will have 128 apartments and electric vehicle charging on site.
Interest-list members hear about pricing, availability and tour dates first, and choose their apartment first. No cost, no obligation.