Gallery

Inside and out.

Photographed in the finished apartments at Building One, plus the site as it stands today.

Inside the Apartments

Finished, and photographed.

The private balconies face the Seekonk
The private balconies face the Seekonk
Open kitchen and living area
Open kitchen and living area
Sliders to the balcony from the living area
Sliders to the balcony from the living area
Quartz counters, stainless appliances, island seating
Quartz counters, stainless appliances, island seating
Wide-plank flooring throughout
Wide-plank flooring throughout
Bedroom with its own climate control
Bedroom with its own climate control
Quartz vanity and porcelain tile
Quartz vanity and porcelain tile
Tiled shower with a built-in bench
Tiled shower with a built-in bench
A full-size washer and dryer in every home
A full-size washer and dryer in every home
Walk-in pantry storage
Walk-in pantry storage

The Site

The building and the campus.

Aerial view of The Apartments at East Point with the Seekonk River behind
The building and the Seekonk River, looking west
Aerial view of East Point — the waterfront homes, the central green and the Seekonk River
The waterfront at East Point
Architectural rendering of Building Two
Building Two — architectural rendering
Aerial view of the whole East Point campus — the apartment buildings, townhomes, condominiums and the central green
The twenty-seven-acre campus from above
North and south elevation drawings for Building Two
Building Two — north and south elevations

Renderings are artist’s conceptions and may differ from the completed building.

Building One opens November 1, 2026.

Interest-list members hear about pricing, availability and tour dates first, and choose their apartment first. No cost, no obligation.